Recycling Centre - Cardiff
We have provided two buildings for this recycling centre in Cardiff. The first building was a biomass boiler shed. We were asked to provide somewhere for a biomass boiler to be housed which meant the building needed to be fairly tall as an excavator was used to load the hopper. The building itself utilised a galvanised steel frame measuring 10m wide x 20m long x 6m eaves.
The second building we provided was a HGV workshop. The building chosen for this task was a hot rolled portal frame measuring 17m wide x 30m long x 6m eaves. It had a total of 5 bays of which 4 had full width & height roller shutter entrances to allow HGV’S to be worked on over the top of the access pits cast into the concrete floor.
For more information on our building work contact us. Or get a quote for similar projects